Scope of safety engineering services:
Risk assessment for the technical application
Instructions for a safe operator organisation
Definition of inspection periods (mainly for pressure equipment)
General conditions:
Fan with a total operating performance of 1.2 megawatts
Pendulum generator with an output of 670 KW
Pressure volume product of the pipe system greater than 20,000
Jörg Gehrmann
Head of Department
jörg.gehrmann(at)edag-ps.com
+49 (151)26907568