Back

E-MOBILITY – BATTERY PRODUCTION

Scope of the simulation 

  • Assembly of cells, cell frames, cell blocks and housings 

  • Transport via stationary conveyor technology and robots 

 

General conditions 

  • Production of different types of products 

  • Consideration of the workpiece carrier circuit 

  • Consideration of faults, out-of-spec and rework 

 

Results

  • Key performance indicators of lines 

  • Number of workpiece carriers 

  • Capacity utilisation of stations 

 


Jörg Gehrmann

Head of Department
jörg.gehrmann(at)edag-ps.com
+49 (151)26907568

 

Loading