Back

MANUFACTURING OF AIRCRAFT COMPONENTS

Scope of the simulation 

  • Mapping of all station-related production steps 

  • Consideration of resources (e.g. workers, cranes, facilities) 

  • Consideration of location-related restrictions (max. number of workers in the production area) 

 

General conditions

  • Long work cycles with a variety of different activities 

  • Complex restrictions due to limited resources 

 

Results 

  • Validation of the planned output 

  • Visualisation of the use of all resources 

  • Use of the simulation model for detailed planning of individual work cycles 

 


Jörg Gehrmann

Head of Department
jörg.gehrmann(at)edag-ps.com
+49 (151)26907568

 

Loading