Scope of the simulation
Truck delivery
Transportation with forklifts
Conveyor technology, lifters
General conditions
Consideration of the routes for unstacking the lifts
Synchronisation with MTM time model
Results
Identification of bottlenecks
Investment needs for forklifts
Failure analysis for late trucks
Jörg Gehrmann
Head of Department
jörg.gehrmann(at)edag-ps.com
+49 (151)26907568