Scope of the simulation
Mapping of all manual stations and automatic processes, including front stoppers, main stoppers and release sensors
Mapping of conveyor lines, workpiece carriers and driverless transport vehicles
Mapping of test benches and reworking stations
General conditions
Versatile assembly plant with individual processing time
Non-linear manufacturing structure with cycles for rework processes
Statically incalculable cycle losses due to multiple runners as a result of rework processes
Restrictions on manual stations through a limited number of workers
Results
Validation of the planned output
Verification of chaining concepts
Optimisation of rework strategies
Optimisation of the number of conveying tools
Investigation of variant-dependent bottlenecks